As a part of station improvement work at Mira Road station, the south-side staircase of the second southernmost Foot Over Bridge (FOB) at Platform No. 1 requires dismantling.
In view of the above, the said staircase will remain closed for commuters from the night of 25th July, 2025. Commuters can use the existing staircases, escalators, and elevators connected to the Middle FOB, North FOB, and South FOB at Platform No. 1 of Mira Road station.
Mumbai News: BMC Sanitation Workers Call Off Strike After Assurances On Job Security, Regularisation Of Contract StaffInconvenience to the passengers is highly regretted.
You may also like
Patient connected to IV drip in CAR as hospital system accused of 'third world' failure
Ozzy Osbourne was handed the Prince of Darkness nickname after two self-reflections
Indian attacked in Ireland: 'In touch with victim,' says embassy; 'requisite assistances offered'
Spanish hotspot in chaos as popular beaches risk 'vanishing for good'
Next's 'classy' polka dot dress gets wedding guests 'lots of compliments'